蔬菜大棚建设中的材料和技术方面的控制方法
现在随着新型设施农业的推广,选择温室大棚种植的人们越来多,温室行业发展也越来越快速,在选择温室大棚建设服务商上大家可以根据自己的要求在材料控制、技术控制、施工控制、售后控制这四大方面做好选择: 1、材料使用控制 材料作为温室项目工程的源头,要把好项目质量关,首先要从材料的选用上把好关。像京鹏科技公司设有专业的质检部门,在每一批材料的选用上,专业的质检人员对其进行抽样、检测,根据国家标准及规范要求选定。比如温室项目上用的钢构件,公司对优质的钢材加工除锈,在专业的镀锌厂热镀后,公司质检部门再进行检测,检测合格后才会运往工地使用。 2、技术方面的控制 项目团队要有专业的设计人员,在每个项目开工前,温室项目经理对工程技术人员进行详细的项目培训,把本项目的难点、要点拿出来研讨,对容易出错的地方提前做好防范,这样工程技术人员在项目开工之前做到心中有数,项目启动后按照预定的计划和步骤实施,有效避免了在施工过程中出现错误,也保证了蔬菜大棚建设整个项目的实施质量。 3、施工过程的控制 每个温室项目都配有专业的技术工程师,在项目的实施过程中,工程师服务于施工的全过程。保证施工人员严格按照图纸及规范执行。做到不漏项、不减项,精益求精。 4、售后服务的控制 对项目实行售后跟踪服务,对易损易坏件,公司在保修期内实行定时检查、免费更换。保证用户的正常运营。
Control method of materials and technology in the construction of the greenhouse vegetables
Now with the promotion of new agricultural facilities, people choose the greenhouse planting more and more, the greenhouse industry is developing more and morequickly, in the choice of greenhouse construction service provider you can according to their own requirements in material control, technical control,construction control, after these four aspects of selection:
The use of 1, material control
Material as a source of greenhouse project, take a good project quality, must firstfrom the selection of materials on the good relations. Like Jingpeng technology companies with a professional quality inspection departments, in the selection ofeach batch of material, professional quality inspection personnel, the samplingdetection, according to the national standards and specifications selected. Steel components such as greenhouse project for the company of steel processing,derusting quality, in galvanizing plant thermal professional after plating companyquality inspection department, then testing, after passing the test will betransported to the site to use.
2, control technology
The project team should have professional design staff, before starting each project, the greenhouse project manager training detailed project of engineering and technical personnel, the difficulty of this project, points out research, the error prone areas ahead of prevention, so that the engineering and technical personnel in the project started before the do know the score, after the commencement of the project according to plan and the steps of predetermined implementation, effectively avoid the error in the construction process, but also ensures the implementation of the quality of the whole project.
3, the control of construction process
Each greenhouse project is equipped with a professional and technical engineers,in the project implementation process, engineer service in the whole process of construction. Ensure the construction personnel in strict accordance with thedrawings and specification. Do not leak, not reduce, refine on.
4, after sale service
Implement customer service tracking services for project, the easy damage parts,in the warranty period shall regularly check, free replacement. To ensure the normal operation of the user. |